11:00:53 Europe / Stockholm

Bifogade filer

Kurs & Likviditet

Kursutveckling och likviditet under dagen för detta pressmeddelande

Kalender

2024-05-30 Kvartalsutdelning LUMI 0.720945
2024-03-21 Kvartalsutdelning LUMI 0.691533
2024-02-21 Bokslutskommuniké 2023
2023-11-30 Kvartalsutdelning LUMI 0.72459
2023-11-01 Kvartalsrapport 2023-Q3
2023-08-31 Kvartalsutdelning LUMI 0.72217
2023-08-02 Kvartalsrapport 2023-Q2
2023-06-01 Kvartalsutdelning LUMI 0.720972
2023-05-01 Kvartalsrapport 2023-Q1
2023-03-23 Kvartalsutdelning LUMI 0.679347
2023-02-23 Bokslutskommuniké 2022
2022-12-01 Kvartalsutdelning LUMI 0.700452
2022-10-26 Kvartalsrapport 2022-Q3
2022-09-01 Kvartalsutdelning LUMI 0.720432
2022-07-27 Kvartalsrapport 2022-Q2
2022-06-02 Kvartalsutdelning LUMI 0.688644
2022-04-27 Kvartalsrapport 2022-Q1
2022-03-24 Bonusutdelning LUMI 0.825143
2022-03-24 Kvartalsutdelning LUMI 0.675117
2022-02-17 Bokslutskommuniké 2021
2021-12-02 Kvartalsutdelning LUMI 0.636426
2021-10-27 Kvartalsrapport 2021-Q3
2021-09-02 Bonusutdelning LUMI 0.617211
2021-09-02 Kvartalsutdelning LUMI 0.617211
2021-07-28 Kvartalsrapport 2021-Q2
2021-06-03 Kvartalsutdelning LUMI 0.410892
2021-05-07 Årsstämma 2021
2021-04-28 Kvartalsrapport 2021-Q1
2021-03-25 Kvartalsutdelning LUMI 0.41079
2021-02-18 Bokslutskommuniké 2020
2020-12-03 Kvartalsutdelning LUMI 0.26644
2020-10-28 Kvartalsrapport 2020-Q3
2020-09-03 Kvartalsutdelning LUMI 0.266464
2020-07-29 Kvartalsrapport 2020-Q2
2020-05-28 Kvartalsutdelning LUMI 0.279632
2020-05-11 Årsstämma 2020
2020-04-29 Kvartalsrapport 2020-Q1
2020-03-19 Kvartalsutdelning LUMI 0.295
2020-02-20 Bokslutskommuniké 2019
2019-12-05 Kvartalsutdelning LUMI 0.215289377
2019-10-23 Kvartalsrapport 2019-Q3
2019-09-05 Kvartalsutdelning LUMI 0.22023
2019-07-24 Kvartalsrapport 2019-Q2
2019-05-30 Kvartalsutdelning LUMI 0.213254613
2019-05-10 Årsstämma 2019
2019-04-24 Kvartalsrapport 2019-Q1
2019-03-21 Kvartalsutdelning LUMI 0.2071
2019-02-21 Bokslutskommuniké 2018
2018-12-06 Kvartalsutdelning LUMI 0.2
2018-10-24 Kvartalsrapport 2018-Q3
2018-09-06 Kvartalsutdelning LUMI 0.2014
2018-07-25 Kvartalsrapport 2018-Q2
2018-05-31 Kvartalsutdelning LUMI 0.2053
2018-05-11 Årsstämma 2018
2018-04-25 Kvartalsrapport 2018-Q1
2018-03-22 Kvartalsutdelning LUMI 0.1888
2018-02-15 Bokslutskommuniké 2017
2017-12-07 Kvartalsutdelning LUMI 0.198585
2017-10-25 Kvartalsrapport 2017-Q3
2017-09-07 Kvartalsutdelning LUMI 0.197
2017-07-26 Kvartalsrapport 2017-Q2
2017-05-31 Kvartalsutdelning LUMI 0.1945
2017-05-12 Årsstämma 2017
2017-04-26 Kvartalsrapport 2017-Q1
2017-03-29 Kvartalsutdelning LUMI 0.149
2017-02-22 Bokslutskommuniké 2016
2016-10-26 Kvartalsrapport 2016-Q3
2016-07-27 Kvartalsrapport 2016-Q2
2016-04-27 Kvartalsrapport 2016-Q1
2016-03-29 Ordinarie utdelning LUMI 0.00 SEK
2016-02-18 Bokslutskommuniké 2015
2015-10-28 Kvartalsrapport 2015-Q3
2015-07-29 Kvartalsrapport 2015-Q2
2015-04-29 Kvartalsrapport 2015-Q1
2015-03-29 Ordinarie utdelning LUMI 0.00 SEK
2015-02-18 Bokslutskommuniké 2014
2014-10-29 Kvartalsrapport 2014-Q3
2014-07-30 Kvartalsrapport 2014-Q2
2014-04-29 Kvartalsrapport 2014-Q1
2014-03-29 Ordinarie utdelning LUMI 0.00 SEK
2014-02-20 Bokslutskommuniké 2013
2013-10-30 Kvartalsrapport 2013-Q3
2013-07-24 Kvartalsrapport 2013-Q2
2013-04-24 Kvartalsrapport 2013-Q1
2013-03-29 Ordinarie utdelning LUMI 0.00 SEK
2012-02-22 Bokslutskommuniké 2011
2011-10-27 Kvartalsrapport 2011-Q3
2011-08-01 Kvartalsrapport 2011-Q2
2011-05-10 Kvartalsrapport 2011-Q1
2011-03-28 Årsstämma 2011
2011-03-28 Extra Bolagsstämma 2011
2011-02-23 Bokslutskommuniké 2010
2010-10-27 Kvartalsrapport 2010-Q3
2010-07-28 Kvartalsrapport 2010-Q2
2010-05-07 Årsstämma 2010
2010-04-29 Kvartalsrapport 2010-Q1
2010-02-25 Bokslutskommuniké 2009
2009-10-29 Kvartalsrapport 2009-Q3
2009-08-06 Kvartalsrapport 2009-Q2
2009-05-07 Kvartalsrapport 2009-Q1
2009-05-06 Årsstämma 1
2007-02-01 Split LUMI 1:3

Beskrivning

LandKanada
ListaLarge Cap Stockholm
SektorRåvaror
IndustriGruvdrift & metaller
Lundin Mining är verksamma inom gruvsektorn. Bolaget är specialiserade inom exploatering, prospektering samt distribution av ädelmetaller och övriga råvaror. Störst andel av råvarorna består av koppar, nickel, bly och zink, som vidare utvinns runtom den europeiska marknaden, samt via diverse utbyggnadsprojekt i Afrika. Bolaget innehar även andelar i internationella gruv- och prospekteringsprojekt. Huvudkontoret ligger i Vancouver.
2023-07-13 20:00:00

TORONTO, July 13, 2023 /CNW/ - (TSX: LUN; Nasdaq Stockholm: LUMI) Lundin Mining Corporation ("Lundin Mining" or the "Company") is pleased to announce the closing of the acquisition of fifty-one percent (51%) of the issued and outstanding equity of SCM Minera Lumina Copper Chile ("Lumina Copper"), which owns the Caserones copper-molybdenum mine ("Caserones'") located in Chile, from JX Metals Corporation and certain of its subsidiaries (collectively, "JX"), as previously announced on March 27, 2023 (the "Acquisition"). Additionally, the Company is pleased to announce it has obtained commitments for a three-year term loan ("Term Loan") in a principal amount of $800million,with an additional $400million accordion available upon receipt of additional binding commitments and closing of up to an additional nineteen (19%) interest in Lumina Copper and satisfaction of relevant conditions precedent. The Term Loan is subject to the execution and delivery of definitive documentation in form and substance satisfactory to the Company and the Term Loan lenders and satisfaction of relevant conditions precedent.

Chief Executive Officer, Peter Rockandel, commented "With the addition of Caserones, LundinMining adds another long-life copper mine of meaningful size with significant growth potential to our portfolio of high-quality assets. The Caserones team has achieved material operational improvements in recent years, and I am confident that we will unlock additional upside through our considerable knowledge, experience, and existing presence in the region. The Caserones acquisition further solidifies Lundin Mining as a significant contributor to Chile in the Atacama Region and as a growing global producer of copper as the world shifts to a lower carbon future. On a proforma basis including Caserones, Lundin Mining's operations produced over 191,000 tonnes of copper in the first half of this year."

Teitur Poulsen, Senior Vice President and Chief Financial Officer, added "Lundin Mining's cash-generation potential has further increased with the addition of Caserones. To that end, it is very pleasing to see Lumina Copper generate approximately $120 million under the Acquisition lock-box in the first six months of the year and to end June with a cash position of over $150 million on a 100% basis. In conjunction with the Caserones acquisition, the Company has received $800million in Term Loan commitments from our existing lenders as well as from three new banks at competitive terms, demonstrating that this Acquisition has also been accretive from a credit perspective. The new $800million Term Loan, combined with the existing $1.75 billion revolving facility, will ensure that the Company retains a strong funding position with significant liquidity headroom as we continue progressing Josemaria and other growth projects within the portfolio."

The Company paid an aggregate of approximately $800 million in cash consideration at closing. Remaining deferred cash consideration of $150million will be payable in installments over the six-year period following the closing date. Lundin Mining also has the right to acquire up to an additional 19%interest in Lumina Copper for $350 million over a five-year period commencing on the first anniversary of the date of closing.

Technical Report for Caserones as Standalone Operation

A technical report for the Caserones mine titled "Caserones Mining Operation, Chile, NI43-101 Technical Report on the Caserones Mining Operation" (the "Technical Report") has been prepared and filed today in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects and is available for review under the Company's profile on SEDAR (www.sedar.com) and on the Company's website (www.lundinmining.com).

The Company believes that many opportunities exist to improve upon the life-of-mine plan presented in the Technical Report. Proximity to Lundin Mining's Candelaria operation, approximately 160km from Caserones, and Josemaria project, approximately 20 km from Caserones, introduce clear opportunities to realize additional savings and implement effective supply, logistical and management strategies not yet reflected in the life-of-mine plan. Further, Lundin Mining believes significant exploration potential exists within the over 58,500 hectares of the Caserones land package in the highly prospective Vicuña District.

Caserones Production & Guidance

Caserones produced 69,704 t of copper and 2,393 t of molybdenum in the first half of 2023 on a 100% basis. Copper production was comprised of 61,333 t of copper in concentrate and 8,371 t of copper cathodes.

Production guidance for the second half of 2023 is 60,000-65,000t of copper and 1,500-2,000 t of molybdenum on a 100% basis. Caserones 2023 copper and molybdenum production are expected to be weighted to the first half of the year primarily due to seasonal winter weather operating considerations typically experienced during the third quarter. Implied full-year 2023 production guidance may differ from estimates contained in the Technical Report primarily given results achieved year-to-date and refinement of near-term plans compared to the Technical Report overall effective date of December 31, 2022. Annual production guidance for Caserones on a 100% basis for both 2024 and 2025 is 110,000-120,000 t of copper and 1,500-2,500 t of molybdenum.

Cash cost[1] for the second half of 2023 is forecast to be $2.30/lb - $2.45/lb of copper, after by-product credits, assuming an average price of $20/lb molybdenum.

Caserones' capital expenditures for the second half of 2023 are forecast to total$110 million on a 100% basis. Of this, capitalized waste stripping and mine development are forecast to beapproximately $45 million, mine and mill capital expenditures are forecast to be$30million, and$25 millionis estimated for capitalized tailings storage facilities costs.

____________________________________
1 Cash cost is non-GAAP measures. Please refer to the Company's discussion of non-GAAP and other performance measures in its Management's Discussion and Analysis for the three months ended March 31, 2023.

Commitments for New $800 Million Term Loan

The Company has received commitments from ten lenders for a new Term Loan in a principal amount of $800 million, which it expects to use to refinance the drawdown under the existing $1.75 billion revolving credit facility which was used to fund the upfront cash consideration of the Acquisition. The commitments remain subject to the execution and delivery of definitive documentation in form and substance satisfactory to the Company and the Term Loan lenders and the satisfaction of applicable conditions precedent. It is expected that the Term Loan will have a term of three years from closing thereof, and provide for an additional $400 million non-committed accordion, which would become available upon receipt of additional binding commitments and closing of up to an additional nineteen percent (19%) interest in Lumina Copper and satisfaction of applicable conditions precedent.

It is expected that the Term Loan will bear interest on US dollar denominated drawn funds at an annual rate equal to the Term Secured Overnight Financing Rate plus a credit spread adjustment plus an applicable margin of 1.60% to 2.65%, depending upon the Company's net leverage ratio. It is expected that the Term Loan will be unsecured, save and except for a charge over certain assets in the United States of America, and will have similar covenants to the Company's existing $1.75 billion revolving credit facility.

Upon execution, the Term Loan agreement will be available for review under the Company's profile on SEDAR (www.sedar.com).

Caserones Mineral Resource & Mineral Reserve Estimates

Mineral Resources and Mineral Reserves are reported on a 100% basis (Lundin Mining holds a 51% interest) using the 2014 Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves (the "2014 CIM Definition Standards") and have an effective date of December 31, 2022. The Mineral Resource estimate is based on 1,045 core and reverse circulation drillholes totaling 175,280 m and includes all drilling completed up until the end of 2017.

Mineral Resources are reported inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves have not demonstrated economic viability. The Qualified Person responsible for the Mineral Resource estimate is Mr. Paul Daigle, P.Geo., Associate Principal Geologist with AGP Mining Consultants Inc.  

Mineral Resource Statement, effective December 31, 2022

Grade Contained Metal
Category Million CuT Mo CuT Mo
Tonnes % % kt kt
Measured 173 0.36 0.012 617 21
Indicated 850 0.30 0.010 2,532 84
Measured & 1,023 0.31 0.010 3,150 105
Indicated
Inferred 121 0.26 0.012 317 14
Notes:

1. All
figures are
rounded to
reflect the
relative
accuracy of
the
estimate.

2. Totals
may not sum
due to
rounding as
required by
reporting
guidelines.
3. Open pit
mineral
resources
are reported
within an
optimized
constraining
shell.
4. Open pit
cut-off
grade is
0.13% CuT.

The basis for the Mineral Reserve estimate is the ore grade material contained within a set of operational phase designs currently being used at Caserones to guide mining operations. The Qualified Person responsible for the Mineral Reserves estimate is Mr. Kirk Hanson, P.E., Principal Mining Engineer with AGP Mining Consultants Inc. 

Mineral Reserve Statement, effective December 31, 2022

Grade Contained
Metal
Category Million CuT Mo CuT Mo
Tonnes % % kt kt
Proven 144 0.36 0.016 518 13
Probable 706 0.29 0.013 2,036 63
Total Reserves 850 0.30 0.014 2,554 76
Notes:

1. The Mineral
Reserves have an
effective date
of December 31,
2022 and are
reported at the
point of
delivery to the
process plant.
The Qualified
Person
responsible for
the estimate is
Mr. Kirk Hanson,
P.E., Principal
Mining Engineer
with AGP.
2. Mineral
Reserves are
reported within
a design pit
based on
optimized
Lerchs-Grossmann
pit shell. Input
parameters
include the
following:  long
term copper
price of
US$3.65/lb and
long term
molybdenum price
of US$11.45/lb;
a 2.88% net
smelter return
(NSR) royalty
rate; average
life-of-mine
(LOM) mining
cost of
US$2.32/t mined,
average LOM
copper
concentrate
processing cost
of US$8.20/t
processed,
average LOM
general and
administrative
(G&A) costs of
US$3.83/t
processed and
average
desalinated
water cost of
$0.75/t
processed;
average LOM
molybdenum
concentrate
processing cost
of US$24.93/t of
concentrate;
average LOM dump
leach cost of
$1.47/t placed;
bench face
angles that
range from
60-70º; fixed
metallurgical
recoveries of
82.7%, 53.7%,
and 60% for
copper
concentrate,
copper dump
leach, and
molybdenum
concentrate
respectively.
Cut-off grades
are based on
block values
with positive
value blocks
classified as
ore. Dilution
and ore loss are
accounted for in
the resource
model blocks,
and no
additional ore
loss or dilution
is applied.
3. Mineral
Reserves are
presented on a
100% basis. MLCC
owns the
project. LMC
beneficially
holds a 51%
interest in MLCC
and JX
beneficially
holds the
remaining 49%
interest in
MLCC.
4. Tonnages are
metric tonnes
rounded to the
nearest 100,000.
Copper grade is
rounded to the
nearest 0.01 %
copper. CuT (kt)
are estimates of
metal contained
in tonnages and
do not include
allowances for
processing
losses.
Contained copper
is reported as
kilo tonnes,
rounded to the
nearest 1,000.
5. Rounding of
tonnes and
contained metal
content as
required by
reporting
guidelines may
result in
apparent
differences
between tonnes,
grade and
contained metal
content. 

Technical Information

The Qualified Person responsible for the scientific and technical information contained herein is Arman Barha, P.Eng., Vice President, Technical Services of the Company. Mr. Barha, who is a "qualified person" as defined under NI 43-101, has reviewed and approved the technical information in this news release. For additional information, including with respect to data verification and exploration information, see the Technical Report.

The information in this release is subject to the disclosure requirements of Lundin Mining under the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact persons set out below on July 13, 2023 at 14:00 Eastern Time.

Cautionary Statement on Forward-Looking Information

Certain of the statements made and information contained herein is "forward-looking information" within the meaning of applicable Canadian securities laws. All statements other than statements of historical facts included in this document constitute forward-looking information, including but not limited to statements regarding the Company's plans, prospects and business strategies; the significant growth potential to the Company's portfolio of assets and expected synergies and potential for cost savings; the potential to unlock additional upside; expectations regarding the world shifting to a lower carbon future; statements regarding the Term Loan, and anticipated timing for completion; the Company's expectations regarding liquidity; the anticipated development of Josemaria and other growth projects; anticipated cash costs and capital expenditures; expectations regarding 2023 production guidance; the Company's guidance on the timing and amount of future production and its expectations regarding the results of operations; expected costs; permitting requirements and timelines; timing and possible outcome of pending litigation; the results of any Preliminary Economic Assessment, Feasibility Study, or Mineral Resource and Mineral Reserve estimations, life of mine estimates, and mine and mine closure plans; anticipated market prices of metals, currency exchange rates, and interest rates; the development and implementation of the Company's Responsible Mining Management System; the Company's ability to comply with contractual and permitting or other regulatory requirements; anticipated exploration and development activities at the Company's projects; expectations and ability to complete the Caserones transaction; the Company's integration of acquisitions and any anticipated benefits thereof, including the Caserones transaction; and expectations for other economic, business, and/or competitive factors. Words such as "believe", "expect", "anticipate", "contemplate", "target", "plan", "goal", "aim", "intend", "continue", "budget", "estimate", "may", "will", "can", "could", "should", "schedule" and similar expressions identify forward-looking statements.

Forward-looking information is necessarily based upon various estimates and assumptions including, without limitation, the expectations and beliefs of management, including that the Company can achieve certain synergies, access financing, appropriate equipment and sufficient labour; assumed and future price of copper, nickel, zinc, gold and other metals; anticipated costs; ability to achieve goals; the prompt and effective integration of acquisitions; that the political environment in which the Company operates will continue to support the development and operation of mining projects; and assumptions related to the factors set forth below. While these factors and assumptions are considered reasonable by Lundin Mining as at the date of this document in light of management's experience and perception of current conditions and expected developments, these statements are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information. Such factors include, but are not limited to: the inability to satisfy the conditions of the Term Loan; global financial conditions, market volatility and inflation, including pricing and availability of key supplies and services; risks inherent in mining including but not limited to risks to the environment, industrial accidents, catastrophic equipment failures, unusual or unexpected geological formations or unstable ground conditions, and natural phenomena such as earthquakes, flooding or unusually severe weather; uninsurable risks; project financing risks, liquidity risks and limited financial resources; volatility and fluctuations in metal and commodity demand and prices; delays or the inability to obtain, retain or comply with permits; significant reliance on a single asset; reputation risks related to negative publicity with respect to the Company or the mining industry in general; health and safety risks; risks relating to the development of the Josemaria Project; inability to attract and retain highly skilled employees; risks associated with climate change; compliance with environmental, health and safety laws and regulations; unavailable or inaccessible infrastructure, infrastructure failures, and risks related to ageing infrastructure; risks inherent in and/or associated with operating in foreign countries and emerging markets, including with respect to foreign exchange and capital controls; economic, political and social instability and mining regime changes in the Company's operating jurisdictions, including but not limited to those related to permitting and approvals, environmental and tailings management, labour, trade relations, and transportation; risks relating to indebtedness; the inability to effectively compete in the industry; the inability to currently control the Caserones mine and the ability to satisfy the conditions and consummate the Caserones transaction on the proposed terms and expected schedule; risks associated with acquisitions and related integration efforts, including the ability to achieve anticipated benefits, unanticipated difficulties or expenditures relating to integration and diversion of management time on integration; changing taxation regimes; risks related to mine closure activities, reclamation obligations, environmental liabilities and closed and historical sites; reliance on key personnel and reporting and oversight systems, as well as third parties and consultants in foreign jurisdictions; information technology and cybersecurity risks; risks associated with the estimation of Mineral Resources and Mineral Reserves and the geology, grade and continuity of mineral deposits including but not limited to models relating thereto; actual ore mined and/or metal recoveries varying from Mineral Resource and Mineral Reserve estimates, estimates of grade, tonnage, dilution, mine plans and metallurgical and other characteristics; ore processing efficiency; community and stakeholder opposition; financial projections, including estimates of future expenditures and cash costs, and estimates of future production may not be reliable; enforcing legal rights in foreign jurisdictions; environmental and regulatory risks associated with the structural stability of waste rock dumps or tailings storage facilities; activist shareholders and proxy solicitation matters; risks relating to dilution; regulatory investigations, enforcement, sanctions and/or related or other litigation; risks relating to payment of dividends; counterparty and customer concentration risks; the estimation of asset carrying values; risks associated with the use of derivatives; relationships with employees and contractors, and the potential for and effects of labour disputes or other unanticipated difficulties with or shortages of labour or interruptions in production; conflicts of interest; existence of a significant shareholder; exchange rate fluctuations; challenges or defects in title; internal controls; compliance with foreign laws; potential for the allegation of fraud and corruption involving the Company, its customers, suppliers or employees, or the allegation of improper or discriminatory employment practices, or human rights violations; the threat associated with outbreaks of viruses and infectious diseases; risks relating to minor elements contained in concentrate products; and other risks and uncertainties, including but not limited to those described in the "Risk and Uncertainties" section of the Company's Annual Information Form and the "Managing Risks" section of the Company's MD&A for the year ended December 31, 2022, which are available on SEDAR at www.sedar.com under the Company's profile.

All of the forward-looking statements made in this document are qualified by these cautionary statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, forecast or intended and readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking information. Accordingly, there can be no assurance that forward-looking information will prove to be accurate and forward-looking information is not a guarantee of future performance. Readers are advised not to place undue reliance on forward-looking information. The forward-looking information contained herein speaks only as of the date of this document. The Company disclaims any intention or obligation to update or revise forward-looking information or to explain any material difference between such and subsequent actual events, except as required by applicable law.

Cautionary Notes to Investors - Mineral Resource and Reserve Estimates

In accordance with applicable Canadian securities laws, Mineral Reserve and Mineral Resource estimates of the Company disclosed or referenced in this news release have been prepared in accordance with the disclosure standards of Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101"), and have been classified in accordance with Canadian Institute of Mining Metallurgy and Petroleum's 2014 edition of the "Definition Standards for Mineral Resources and Reserves". The Measured and Indicated Mineral Resource estimates are inclusive of those Mineral Resource estimates modified to produce the Mineral Reserve estimates. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Caserones Mineral Resource and Mineral Reserve estimates are shown on a 100% basis. Lundin Mining holds a 51% interest in the Caserones operations. Estimates are effective as atDecember 31, 2022.

 