21:01:44 Europe / Stockholm

Bifogade filer

Kurs & Likviditet

Kursutveckling och likviditet under dagen för detta pressmeddelande

Kalender

2024-11-08 Kvartalsrapport 2024-Q3
2024-08-09 Kvartalsrapport 2024-Q2
2024-06-24 Ordinarie utdelning FIL 0.00 SEK
2024-06-21 Årsstämma 2024
2024-05-08 Kvartalsrapport 2024-Q1
2024-03-20 Bokslutskommuniké 2023
2023-11-10 Kvartalsrapport 2023-Q3
2023-08-10 Kvartalsrapport 2023-Q2
2023-06-09 Ordinarie utdelning FIL 0.00 SEK
2023-05-10 Kvartalsrapport 2023-Q1
2023-03-17 Bokslutskommuniké 2022
2022-11-10 Kvartalsrapport 2022-Q3
2022-08-11 Kvartalsrapport 2022-Q2
2022-06-06 Ordinarie utdelning FIL 0.00 SEK
2022-05-04 Kvartalsrapport 2022-Q1
2022-03-22 Bokslutskommuniké 2021
2021-11-12 Kvartalsrapport 2021-Q3
2021-08-13 Kvartalsrapport 2021-Q2
2021-06-09 Ordinarie utdelning FIL 0.00 SEK
2021-05-06 Kvartalsrapport 2021-Q1
2021-03-18 Bokslutskommuniké 2020
2020-11-12 Kvartalsrapport 2020-Q3
2020-08-13 Kvartalsrapport 2020-Q2
2020-06-23 Ordinarie utdelning FIL 0.00 SEK
2020-06-18 Årsstämma 2020
2020-05-06 Kvartalsrapport 2020-Q1
2020-03-19 Bokslutskommuniké 2019
2019-11-08 Kvartalsrapport 2019-Q3
2019-08-08 Kvartalsrapport 2019-Q2
2019-06-20 Årsstämma 2019
2019-05-10 Ordinarie utdelning FIL 0.00 SEK
2019-05-08 Kvartalsrapport 2019-Q1
2019-03-19 Bokslutskommuniké 2018
2018-11-09 Kvartalsrapport 2018-Q3
2018-08-09 Kvartalsrapport 2018-Q2
2018-06-15 Ordinarie utdelning FIL 0.00 SEK
2018-06-14 Årsstämma 2018
2018-05-10 Kvartalsrapport 2018-Q1
2018-03-20 Bokslutskommuniké 2017
2017-11-28 Kvartalsrapport 2017-Q3
2017-08-11 Kvartalsrapport 2017-Q2
2017-06-15 Ordinarie utdelning FIL 0.00 SEK
2017-06-14 Årsstämma 2017
2017-05-16 Kvartalsrapport 2017-Q1
2017-03-28 Bokslutskommuniké 2016
2016-11-29 Kvartalsrapport 2016-Q3

Beskrivning

LandKanada
ListaFirst North Stockholm
SektorRåvaror
IndustriGruvdrift & metaller
Filo är ett kanadensiskt bolag verksamma inom gruvsektorn. Bolaget är specialiserade inom prospektering, exploatering samt vidare distribution av metaller och råvaror. Råvarorna består huvudsakligen av guldförnödenheter samt silver. Övriga produkter som tillverkas inkluderar koppar och bly. Kunderna återfinns inom ett flertal sektorer, med störst inriktning mot grossisthandeln samt industrin. Verksamheten drivs runtom den globala marknaden med störst närvaro inom Nordamerika och Europa.
2024-03-21 01:00:00

Vancouver, BC, March 20, 2024 /CNW/ -  Filo Corp. (TSX: FIL) (Nasdaq First North Growth Market: FIL) (OTCQX: FLMMF) ("Filo", or the "Company") announces its results for the three months and year ended December 31, 2023.

 

Jamie Beck, President & CEO, commented, "Our 2023 year-round drilling program was the most expansive campaign conducted to date and continued to demonstrate the vast resource potential at Filo. Drilling extended the boundaries of the Aurora Zone and improved our geological interpretation. Additionally, our large step-out holes provided very promising results that indicate continuous mineralization from the Aurora Zone towards the northern Bonita Zone, with mineralization remaining open at both ends.  A 40,000m year-round drilling campaign is planned in 2024, which will continue to focus on the areas we have targeted to date and also test the boundaries of the deposit with other large step-out and frontier exploration holes. With eleven target zones distributed across an area of 8km north-south and 3km east-west, we plan on testing the potential for Filo to be significantly larger than we currently know."

2023 Highlights

During 2023, the Company successfully delivered its most extensive drilling campaign to date, completing 37,188m of resource drilling and 1,597 metres of geotechnical drilling. The Company's interpretation of the high-grade Aurora Zone has improved dramatically and drilling has continued to expand the footprint of the Filo del Sol deposit via numerous small and large step-out holes. Calendar year (and subsequent to) highlights included:
  • Assay results announced for holes FSDH097, FSDH098 and FSDH100, which span a total distance of 1.6km, expand the Filo deposit to the west along the entire distance between the holes drilled. FSDH100 is an example of the successful Aurora Zone step-out drilling conducted by the Company, adding over 500m in depth beyond the current resource pit shell and extending the western margin of the deposit by 250m;
  • Assay results announced for holes FDSH086, FSDH089 and FSDH095 highlight the precious metals-rich nature of the Filo deposit. All three holes encountered the high-grade silver zone, and hole FSDH086 intersected a new phase of the porphyry, encountering high-grade porphyry-style mineralization with unusually higher gold grades and copper hosted by a chalcopyrite-bornite assemblage. Located at the northwestern edge of the Aurora Zone, the results demonstrate the significant potential that exists at Filo to find new styles of mineralization;
  • Assay results announced for holes FSDH093 and FSDH094, which were collared 500m apart, filled critical high-grade gaps in the Company's interpretation as well as extending Aurora to the northeast. The high-grade porphyry zone at depth in hole FSDH093 is similar to, and over 300m away from, the intersection of hole FSDH086;
  • Assay results announced for hole FSDH084 resulted in the second-best hole from a grade-thickness perspective ever drilled at the Filo del Sol Project. The results of hole FSDH084 confirmed the continuity of high-grade mineralization within the Aurora Zone, including the high-grade Breccia 41 Zone;
  • Assay results from holes FSDH087, FSDH090 and FSDH091 support the idea of continuous mineralization across the 1.3km distance between the Aurora and Bonita Zones. Additional holes in this area are underway, some of which have been completed with assays pending, which will provide critical information on the continuity of mineralization from Tamberias in the south to Bonita in the north (a distance of over five kilometres);
  • Assay results for hole FSDH091 resulted in the first intersection of high-grade mineralization near the Bonita Zone, and the first instance of consistent grades greater than 1% CuEq outside the Aurora Zone. FSDH091 included a high-grade section averaging 1.15% CuEq over 212m. At over 1km north of the Aurora Zone, the results from this hole opened up an entirely new area to explore for high-grade mineralization;
  • In June 2023, the Company closed a $130.0 million private placement, raising funds at market prices with limited dilution and with strong support from institutional investors;
  • In June 2023, the Company announced a corporate name change to "Filo Corp." to better align with the Company's strategic vision.

2023 Drilling and Assay Results

Drilling and assay results disclosed by the Company during and subsequent to the year ended December 31, 2023 are summarized in Appendix 1 to this news release.

Outlook

Drilling continues to be the Company's primary focus with nine drill rigs operating at site. The planned 2024 drilling program is expected to be the Company's most ambitious program to date, including 40,000m of drilling planned with a renewed focus on exploration growth with multiple step-out targets from zones of known mineralization.

Drilling will remain a mix of both large and small step-outs in all directions from the Aurora Zone, as well as resource definition drilling within it. The Company continues to maintain a strong focus on improving drill productivity through a variety of initiatives.

Data collected from the current campaign is being used to develop a comprehensive geological model which will guide further exploration and form the basis of an eventual update to the Mineral Resource estimate. The Company is continuing preliminary metallurgical testwork on the sulphide mineralization, as well as environmental and social baseline programs in support of future project permitting.

The Company's plans and timelines are subject to equipment and staff availability, along with being able to operate safely and effectively and in accordance with the Company's health and safety protocols.

Selected Financial Information

(in thousands of December December
Canadian dollars) 31, 31,
2023 2022
Cash and cash 108,120 74,915
equivalents
Working capital 86,995 60,296
Mineral 10,075 9,737
properties
Total assets 124,389 85,964
The financial
information in
this table was
selected from the
consolidated
financial
statements for
year ended
December 31,
2023, which are
available on
SEDAR+ at
www.sedarplus.ca
and at the
Company's website
www.filocorp.com

Financial Results

(in thousands of Canadian dollars, Three Year
except per share amounts) months ended
ended
December December
31, 31,
2023 2022 2023 2022
Exploration and project investigation 36,286 25,605 143,131 82,524
General and administration ("G&A"), 3,554 1,381 9,305 5,313
excluding share-based compensation
expense(1)
Share-based compensation expense(1) 1,088 2,009 8,211 9,460
Net loss 32,157 21,008 115,113 68,961
Basic and diluted loss per share 0.25 0.17 0.90 0.57
(1)  Share based compensation is a non
-cash cost which reflects the
amortization of the estimated fair value
of share options over their vesting
period. The fair value of share options
is calculated using the Black-Scholes
pricing model, which relies heavily on
the Company's share price and historical
share price volatility. Due to the
material increase in the Company's share
price and volatility since 2021, the
calculated fair value of the Company's
share options has increased
considerably, resulting in a higher
share option value and resultant share
-based compensation expense being
recognized. A portion of this expense is
included in Exploration and Project
Investigation expense.

The financial information in this table
was selected from the Company's
consolidated financial statements for
the year ended December 31, 2023, which
are available on SEDAR+ at
www.sedarplus.ca and the Company's
website www.filocorp.com

For the three months and year ended December 31, 2023, Filo incurred net losses of $32.2 million and $115.1 million, respectively (2022 - $21.0 million and $69.0 million) including operating losses of $40.7 million and $159.1 million, respectively (2022 - $28.6 million and $95.5 million) and net gains of $7.6 million and $38.6 million, respectively, from the use of marketable securities (2022 - $8.4 million and $25.0 million). Exploration and project investigation costs are generally the most significant expenses for the Company and for the three months and year ended December 31, 2023, they accounted for approximately 89% and 90% of the operating losses, respectively (2022 - 90% and 86%). The Company expenses its exploration costs through the consolidated statement of comprehensive loss, except for mineral property option payments and mineral property acquisition costs, which are capitalized.

Liquidity and Capital Resources

As at December 31, 2023, the Company had cash and cash equivalents of $108.1 million and net working capital of $87.0 million, compared to cash and cash equivalents of $74.9 million and net working capital of $60.3 million as at December 31, 2022. The increase in the Company's cash and cash equivalents and net working capital is due the non-brokered private placement completed in June 2023 which resulted in net proceeds of $129.1 million, plus the net $1.1 million BHP Top-Up and $4.9 million in gross proceeds received by the Company in relation to the exercise of stock options during the year ended December 31, 2023. These cash inflows were offset by funds used in operations and for general corporate purposes, plus amounts used in the acquisition of mineral properties ($1.0 million) and equipment and facilities for the Filo del Sol Project ($5.5 million).

The Company will continue to deploy the majority of its treasury to fund ongoing advancement of the Filo del Sol Project, and to a lesser extent, for working capital and general corporate purposes.

About Filo del Sol

Filo del Sol is a high-sulphidation epithermal copper-gold-silver deposit associated with one or more large porphyry copper-gold systems. Overlapping mineralizing events combined with weathering effects, including supergene enrichment, have created several different styles of mineralization, including structurally controlled and breccia-hosted gold, manto-style high-grade silver (+/- copper) and high-grade supergene enriched copper within a broader envelope of disseminated, stockwork and breccia-hosted sulphide copper and gold mineralization. This complex geological history has created a heterogeneous orebody which is characterized by zones of very high-grade copper +/- gold +/- silver mineralization within a large envelope of more homogeneous, lower-grade mineralization.

Qualified Persons and Technical Information

The scientific and technical disclosure for the Filo del Sol Project included in this news release have been reviewed and approved by Bob Carmichael, B.A.Sc., P. Eng. (BC) and/or Jamie Beck, B.A.Sc., P.Eng. Mr. Carmichael is Filo's Vice-President of Exploration and a Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects. ("NI 43-101").  Mr. Beck is Filo's President and Chief Executive Officer and is also a Qualified Person under NI 43-101.

The field programs were carried out under the supervision of the Mr. Carmichael. Samples were cut at Filo's Batidero camp near the project site by company personnel. Beginning in the 2020/2021 season, whole core was transported to a new core processing facility located near Rodeo, Argentina, and all sampling activities were carried out there. Diamond drill core was sampled in two metre intervals (except where shortened by geological contacts) using a rock saw for sulphide mineralization. Oxide mineralization was cut with a core splitter in order to prevent dissolution of water-soluble copper minerals during the wet sawing process. Core diameter is a mix of PQ, HQ and NQ depending on the depth of the drill hole. Samples were bagged and tagged at camp, and packaged for shipment by truck to Mendoza, Argentina. RC Samples were collected at the drill site by company personnel with initial splitting carried out at a facility near the drill sites and final splitting completed at the Batidero camp.

Samples were delivered to the ALS preparation laboratory in Mendoza where they were crushed and a 500g split was pulverized to 85% passing 200 mesh. The prepared samples were sent to either the ALS assay laboratory in Santiago, Chile or Lima, Peru for copper, gold and silver assays and multi-element ICP and sequential copper analyses. ALS is an accredited laboratory which is independent of the Corporation. Gold assays were by fire assay fusion with AAS finish on a 30 g sample. Copper and silver were assayed by atomic absorption following a four-acid digestion. Samples were also analyzed for 36 elements with ICP-ES up to drillhole FSDH053. Starting in August 2021 with drillhole FSDH054, the multielement analyses were changed to ME-MS61 which offers ultra low detection limits for 48 elements.  A sequential copper leach analysis was completed on each sample with copper greater than 500 ppm (0.05%). Copper and gold standards as well as blanks and duplicates (field, preparation and analysis) were randomly inserted into the sampling sequence for quality control. On average, 9% of the submitted samples are quality control samples. No data quality problems were indicated by the quality assurance/quality control program.

Mineralized zones within the Filo del Sol deposit are typically flat-lying, or bulk porphyry-style zones and drilled widths are interpreted to be very close to true widths.

Copper Equivalent is calculated based on US$ 3.00/lb Cu, US$ 1,500/oz Au and US$ 18/oz Ag, with 80% metallurgical recoveries assumed for all metals.  The formula is: CuEq % = Cu % + (0.7292 * Au g/t) + (0.0088 * Ag g/t).

Additional Information

The Company's consolidated financial statements for the year ended December 31, 2023 and related management's discussion and analysis are available on SEDAR+ at www.sedarplus.ca and the Company's website at www.filocorp.com.

The Company's certified adviser on the Nasdaq First North Growth Market is Aktieinvest FK AB, +46 8 506 51703, rutger.ahlerup@aktieinvest.se.

The information contained in this news release was accurate at the time of dissemination but may be superseded by subsequent news release(s). The Company is under no obligation, nor does it intend to update or revise the forward-looking information, whether as a result of new information, future events or otherwise.

This information was submitted by Filo Corp. for publication, through the agency of the contact person set out below, on March 20, 2024 at 08:00 pm EDT.

On behalf of Filo,

Jamie Beck

President and CEO

APPENDIX 1 - 2023 DRILLING AND ASSAY RESULTS

Drilling and assay results disclosed by the Company during and subsequent to the year ended December 31, 2023 are summarized in the following table:

Hole-ID From To Length Cu Au Ag CuEq1
(m)
(m) (m) (%) (g/t) (g/t) (%)
FSDH068A 18.0 1,794.0 1,776.0 0.45 0.30 4.0 0.70
incl. 54.0 94.0 40.0 0.65 0.92 8.1 1.39
incl. 394.0 1,514.0 1,120.0 0.59 0.38 5.3 0.92
incl. 574.0 1,298.2 724.2 0.69 0.45 6.8 1.08
FSDH069A 138.0 1,434.5 1,296.5 0.60 0.38 13.9 1.00
incl. 404.0 435.0 31.0 0.00 0.27 127.0
and incl. 498.0 1,096.0 598.0 0.92 0.57 19.3 1.51
incl. 792.0 886.0 94.0 1.78 1.37 26.3 3.01
FSDH070A 282.0 1,338.5 1,056.5 0.54 0.38 4.0 0.86
incl. 369.7 1,040.0 670.4 0.63 0.41 5.3 0.97
incl. 540.0 712.0 172.0 0.75 0.47 5.9 1.15
FSDH071 292.0 1,320.0 1,028.0 0.78 0.47 6.7 1.16
incl. 408.0 580.0 172.0 1.44 0.82 12.6 2.14
incl. 514.0 574.0 60.0 2.18 1.64 16.9 3.53
incl. 776.0 1,013.5 237.5 1.04 0.68 6.0 1.49
FSDH072 484.0 1,712.0 1,228.0 0.55 0.33 4.4 0.83
incl. 650.0 1,472.0 822.0 0.68 0.42 4.4 1.02
incl. 998.0 1,328.0 330.0 0.88 0.61 2.3 1.35
FSDH073 404.5 1,388.4 983.9 0.62 0.32 4.0 0.89
incl. 600.0 1,214.0 614.0 0.74 0.41 3.2 1.06
incl. 756.0 1,028.0 272.0 0.92 0.52 3.2 1.33
FSDH074 278.0 1,300.0 1,022.0 0.49 0.19 4.4 0.66
incl. 644.0 1,160.0 516.0 0.61 0.21 3.2 0.79
incl. 840.0 1,092.0 252.0 0.65 0.23 3.6 0.85
FSDH075 197.1 1,562.0 1,364.9 0.31 0.12 2.9 0.42
incl. 197.1 268.0 70.9 0.33 0.19 15.4 0.60
and incl. 796.0 1,562.0 766.0 0.40 0.13 1.3 0.51
incl. 910.4 1,202.0 291.6 0.52 0.18 1.2 0.66
FSDH076 180.0 1,543.0 1,363.0 0.48 0.35 3.9 0.77
incl. 496.0 850.9 354.9 0.63 0.40 10.0 1.01
and incl. 952.0 1,120.0 168.0 0.52 0.48 1.1 0.88
and incl. 1264.0 1,490.0 226.0 0.55 0.42 1.2 0.87
FSDH077 192.0 194.0 2.0 0.05 10.35 0.5
plus 404.0 920.2 516.2 0.11 0.11 0.9 0.20
FSDH078 334.0 348.0 14.0 1.16 1.28 0.5 2.10
plus 392.0 422.0 30.0 0.01 0.77 34.6
plus 516.0 579.0 63.0 0.87 0.66 27.8 1.59
FSDH079 68.0 76.0 8.0 0.25 0.40 8.9 0.61
FSDH080 122.0 1,347.5 1,225.5 0.39 0.29 8.9 0.67
incl. 122.0 1,058.0 936.0 0.42 0.33 11.3 0.77
incl. 122.0 216.0 94.0 1.02 0.42 5.8 1.38
incl. 126.0 148.0 22.0 2.25 0.35 1.0 2.51
and incl. 494.0 882.0 388.0 0.39 0.36 20.7 0.83
FSDH081 192.0 242.0 50.0 0.16 0.13 7.2 0.32
FSDH082 No
significant
values
FSDH083 418.7 1,549.8 1,131.1 0.43 0.15 2.8 0.57
incl. 560.0 672.0 112.0 0.52 0.17 6.2 0.70
and incl. 970.0 1,180.0 210.0 0.61 0.22 2.1 0.80
FSDH084 170.0 1,575.8 1,405.8 0.62 0.43 23.2 1.13
incl. 394.0 440.0 46.0 0.01 0.38 310.2
and incl. 616.0 1,258.0 642.0 1.01 0.70 20.6 1.70
incl. 772.0 827.8 55.8 2.98 2.73 92.8 5.79
incl. 778.0 812.0 34.0 3.68 3.73 110.5 7.37
FSDH085 18.0 26.0 8.0 0.98 3.15 433.8 7.09
Plus 320.0 1,199.0 879.0 0.32 0.13 6.0 0.47
incl. 658.0 1,114.4 456.4 0.38 0.14 5.8 0.53
incl. 658.0 667.0 9.0 0.33 0.07 156.8 1.76
FSDH086 400.0 1,414.0 1,014.0 0.66 0.39 9.3 1.02
incl. 410.0 438.0 28.0 0.01 0.21 87.0
and incl. 532.8 567.5 34.7 0.51 0.17 69.0 1.24
and incl. 618.0 1,414.0 796.0 0.77 0.46 4.2 1.14
and incl. 1,370.0 1,414.0 44.0 1.14 0.83 7.5 1.81
FSDH087 42.0 1,472.0 1,430.0 0.40 0.16 4.3 0.55
incl. 292.0 1,472.0 1,180.0 0.46 0.17 3.7 0.61
incl. 190.0 194.0 4.0 1.41 0.33 49.9 2.09
and incl. 232.0 233.0 1.0 2.04 1.02 6.6 2.84
and incl. 300.0 304.0 4.0 4.49 4.10 147.0 8.77
and incl. 350.0 442.0 92.0 0.75 0.40 11.3 1.14
incl. 358.0 374.0 16.0 2.97 1.81 50.1 4.73
incl. 436.0 440.0 4.0 1.58 0.41 33.0 2.17
and incl. 937.5 940.0 2.5 2.00 0.48 145.2 3.63
FSDH088 66.0 1,058.0 992.0 0.36 0.32 3.7 0.63
incl. 436.0 1,018.0 582.0 0.41 0.38 5.4 0.73
FSDH089 136.0 677.0 541.0 0.61 0.65 49.2 1.51
incl. 328.0 416.0 88.0 0.18 0.77 278.5
incl. 336.0 350.0 14.0 0.04 1.60 754.4
and incl. 386.0 394.0 8.0 0.14 0.54 904.7
and incl. 452.0 677.0 225.0 1.00 0.94 3.8 1.72
incl. 452.0 538.0 86.0 1.22 1.34 6.9 2.26
FSDH090 100.0 1,618.5 1,518.5 0.31 0.11 10.3 0.48
incl. 108.0 130.0 22.0 0.07 0.06 490.8
and incl. 268.7 272.0 3.3 2.64 0.92 127.2 4.43
and incl. 539.1 540.0 0.9 2.66 2.04 132.6 5.31
and incl. 665.0 1,322.0 657.0 0.44 0.14 2.0 0.56
FSDH091 168.0 1,536.0 1,368.0 0.40 0.19 2.5 0.56
incl. 185.5 200.0 14.5 0.42 0.97 30.2
and incl. 504.0 508.0 4.0 1.94 1.20 9.8 2.90
and incl. 672.8 1,510.0 837.2 0.53 0.21 1.9 0.70
incl. 872.0 1,084.0 212.0 0.84 0.40 2.2 1.15
FSDH093 338.8 1,788.0 1,449.2 0.41 0.21 5.0 0.61
incl. 492.0 1,144.0 652.0 0.55 0.25 8.6 0.81
incl. 804.0 1,080.0 276.0 0.66 0.31 6.7 0.95
and incl. 1,674.0 1,750.0 76.0 0.63 0.26 2.5 0.84
FSDH094 192.0 1,490.0 1,298.0 0.59 0.40 15.0 1.01
incl. 364.0 416.0 52.0 0.59 0.47 252.4 3.15
and incl. 444.0 748.0 304.0 0.84 0.53 9.4 1.30
FSDH095 122.0 496.0 374.0 0.41 0.38 69.3 1.30
incl. 274.0 294.0 20.0 0.38 0.31 1,209.9
and incl. 332.0 427.1 95.1 0.79 0.59 2.8 1.24
FSDH097 368.0 1,445.0 1,077.0 0.52 0.25 22.4 0.89
incl. 368.0 1,126.0 758.0 0.53 0.30 31.0 1.03
incl. 372.0 521.0 149.0 0.35 0.10 128.0
incl. 450.0 474.0 24.0 0.36 0.15 366.8
incl. 466.0 474.0 8.0 0.44 0.19 725.2
and incl. 707.0 944.0 237.0 0.73 0.60 3.0 1.20
FSDH098 410.0 1,363.8 953.8 0.31 0.13 2.1 0.42
FSDH100 256.0 887.3 631.3 0.38 0.35 5.8 0.68
incl. 340.0 360.0 20.0 0.42 0.29 95.8
FSGT006 36.0 48.0 12.0 0.07 5.21 14.1
incl. 40.0 44.0 4.0 0.09 10.25 18.8
(1)     
Copper
Equivalent is
calculated
based on US$
3.00/lb Cu,
US$ 1,500/oz
Au and US$
18/oz Ag,
with 80%
metallurgical
recoveries
assumed for
all metals.
The formula
is: CuEq % =
Cu % +
(0.7292 * Au
g/t) +
(0.0088 * Ag
g/t)

Additional information on these drilling results is disclosed in the Corporation's press releases. As of the date of this news release, additional holes have been completed with assays pending, which include:
  • FSDH101 · FSDH105 · FSDH111

  • FSDH102 · FSDH106

  • FSDH104 · FSDH108

Assay results for these holes will be released as they are received, analyzed and confirmed by the Company.

Cautionary Note Regarding Forward-Looking Statements

Certain statements made and information contained herein in the news release constitutes "forward-looking information" and "forward-looking statements" within the meaning of applicable securities legislation (collectively, "forward-looking information"). The forward-looking information contained in this news release is based on information available to the Company as of the date of this news release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information. Generally, this forward-looking information can frequently, but not always, be identified by use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "projects", "budgets", "assumes", "strategy", "goals", "objectives", "potential", "possible", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events, conditions or results "will", "may", "could", "would", "should", "might" or "will be taken", "will occur" or "will be achieved" or the negative connotations thereof. All statements other than statements of historical fact may be forward-looking statements.

The Company believes that the expectations reflected in the forward-looking information included in this news release are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking information should not be unduly relied upon.  Information contained in this news release is as of the date of this press release.  In particular, this press release contains forward-looking information pertaining to assumptions made in the interpretation of drill results, geology, grade, geochemistry, potential implications of geophysics interpretations, and continuity of mineral deposits; expectations regarding access and demand for equipment, skilled labour and services needed for exploration and development of mineral properties; and that activities will not be adversely disrupted or impeded by exploration, development, operating, regulatory, political, community, economic, environmental and/or healthy and safety risks.  In addition, this news release may contain forward-looking statements or information pertaining to: potential exploration upside at the Filo del Sol Project, including the extent and significance of the porphyry copper-gold system underlying the current Mineral Resource and the prospectivity of exploration targets; exploration and development plans and expenditures, including a transition to year-round operations and the timing thereof; the ability of the Company's operating protocol to continue to meet government-mandated health and safety guidelines enabling it to conduct its field programs as planned; the success of future exploration activities; potential for resource expansion; ability to build shareholder value; expectations with regard to adding to its Mineral Reserves or Resources through exploration; expectations with respect to the conversion of inferred resources to an indicated resources classification; ability to execute planned work programs; plans or ability to add additional drill rigs; timing or anticipated results of an update to the mineral resource estimate for Filo del Sol; government regulation of mining activities; environmental risks; unanticipated reclamation expenses; title disputes or claims; limitations on insurance coverage; and other risks and uncertainties.

Statements relating to "mineral resources" are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral resources described can be profitably produced in the future.

The forward-looking statements contained in this news release are made as at the date of this news release and Filo does not undertake any obligations to publicly update and/or revise any of the included forward-looking statements, whether as a result of additional information, future events and/or otherwise, except as may be required by applicable securities laws. Forward-looking information is provided for the purpose of providing information about management's current expectations and plans and allowing investors and others to get a better understanding of the Company's operating environment. Forward-looking information is based on certain assumptions that the Company believes are reasonable, including that the current price of and demand for commodities will be sustained or will improve, the supply of commodities will remain stable, that the general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed on reasonable terms and that the Company will not experience any material labour dispute, accident, or failure of plant or equipment. These factors are not, and should not be construed as being, exhaustive. Although the Company has attempted to identify important factors that would cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. All the forward-looking information contained in this document is qualified by these cautionary statements. Readers are cautioned not to place undue reliance on forward-looking information due to the inherent uncertainty thereof.

Follow Us

Twitter: https://twitter.com/filo_corp

LinkedIn: https://www.linkedin.com/company/filocorp/

Instagram: https://www.instagram.com/filo_corp/

Facebook: https://www.facebook.com/FiloCorpOfficial

View PDF version (https://mb.cision.com/Public/17167/3949386/ad229bdc670020b6.pdf)